TEMPORARY POWER / MELBOURNE

FROM
SOURCE
TO SHOW.

Temporary power engineered for events.

Discuss your event

01 / SOURCE

Every event
starts somewhere.

One incoming supply.
A whole event ahead.

02 / DISTRIBUTION

Power where
the event
needs it.

Purpose-built temporary distribution.

03 / INSIDE THE BOARD

PROTECTED.CONTROLLED.READY.

Internal layout shown is illustrative.

Click a breaker to read a customer story.

04 / DELIVERY

ONE SOURCE.
POWER
EVERYWHERE

IT NEEDS TO GO.

05 / FOLLOW THE POWER

POWER DESIGNED
AROUND
THE EVENT.

06 / THE EVENT

Behind every
lit-up space.

The electrical infrastructure
that makes it possible.

FROM SOURCE TO SHOW

YOU CREATE
THE EVENT.
WE’LL POWER IT.

Plan your event power
↓   Scroll to power the experienceEDL / DB 004 400A DISTRIBUTION

FROM THE MODEL TO THE EVENT FLOOR

See what goes
into the setup.

Explore event, exhibition and contracting briefs, and the information that helps turn requirements into a plan.

Explore project briefs ↗

01 / WHAT WE DO

Temporary power,
planned properly.

From the incoming supply to the final connection. Electrical infrastructure designed around your venue, your program and your event.

01

Exhibitions

Temporary electrical distribution for exhibition stands and exhibition environments.

02

Events

Electrical infrastructure supporting temporary event environments.

ONE CONTINUOUS CONNECTION

  1. 01Source
  2. 02Distribution
  3. 03Delivery
  4. 04Event

02 / ON SITE

Built for
the event floor.

Temporary installations. Changing layouts. A clear plan for getting power where it needs to go.

Talk through a project like yours
Illustration of a yellow EDL distribution cabinet in a steel trolley frame, with wheels and temporary cables.
EDL DISTRIBUTION EQUIPMENTEquipment study / illustration
400 A distribution board Equipment specifications +
Supply
415 V · 50 Hz · Three phase
Overall trolley
1555 H × 1230 W × 620 D mm
Weight
150 kg
Input
400 A Powerlock
Main switch
400 A Susol
Construction
Powder-coated steel · Galvanised trolley

03 / THE PEOPLE BEHIND THE POWER

Equipment is only
part of the job.

Successful temporary distribution starts with planning. It takes installation, testing and experienced people to bring the setup together.

We work through the electrical requirements with you, so the distribution fits the event.

  • Planning
  • Installation
  • Testing
  • Event setup

Meet EDL ↗

CUSTOMER STORIES / PREVIEW

Placeholder examples showing how customer stories will read. These are not customer endorsements.

LET’S TALK TEMPORARY POWER

PLANNING
AN EVENT?
LET’S POWER IT.

Tell us your venue, event dates and what you need powered.

FOLLOW THE CONNECTION

Incoming supply

Explore event power ↗

PLACEHOLDER / CUSTOMER STORY

Customer story

Preview content only. This is not a customer endorsement.